
Drillit
QC, performance monitoring and drilling plan compliance
Loading 0%
Delta automatically calculates mine plan spatial compliance using actual topographical surveys and planned mining surfaces. Timely information and agility are the key in addressing spatial deviations from the mining plan
TIMining Delta aims to reduce deviations from the mining plan sequence based on actual surveys and planned surfaces or 3D plan solids. TIMining Delta automatically carries out spatial compliance calculations and outputs compliance solids to import in all major mine planning software
TIMining Delta is a software tool designed for short term mine planners and control and reconciliation engineers who are not satisfied with the time and effort required by the plan spatial reconciliation process. Through its intuitive and user-friendly interface allows quick and easy use
TIMining automatically calculates the spatial differences between the initial and final mine surveys and the mine plan for a given period, categorizing volumes and tonnages. It then generates exportable outputs for each of the plan compliance solids, supported by all commonly used mine planning software
TIMining Delta allows you to define pushbacks and mining areas enabling comparison and understanding of deviations
With TIMining Delta, you can obtain results based on volume and on block model calculations with little effort
Producing planned end-of-period surfaces is no longer a problem with Delta: Get the final surface for a single or multiple periods, starting from the initial topographical survey and the sequence of plan solids
DELTA also allows you to display results in cross section views, customize report categories, import/export defined calculation areas, triangulate polylines; cut surfaces, change triangulation file formats, etc
The time will depend entirely on the size of the inputs; however, the process usually takes between 1 and 5 minutes
In order to use TIMining Delta features you need at least the following:
a. Planned start and end surfaces or planned mining solids.
b. Actual start and end of period topographical surveys
c. Block model
Thanks to its interface and proprietary algorithms, obtaining a plan compliance report should not take longer than 10 minutes for any user.
TIMining Delta can read and write .00t file extensions (Vulcan) and .msr file extensions (Minesight)
Recommended hardware is:
Processor: Intel Core i3-2100 or superior. Recommended Intel Core i5-6500 or superior
• RAM Memory: 8 GB minimum. Recommended 16 GB or more.
• Hard drive: 250 GB minimum. Recommended 500 GB or more.
• Operative System: Windows v.8 64 bits or superior.
• Graphics: Nvidia Fx5500 256mb or superior.
Recommended Nvidia GeForce GT 430 1GB or superior.
• Screen Resolution: Minimum 1366x768 pixels
TIMining Delta supports:
a. .dwg files
b. .dxf files (triangulations or lines)
c. .obj files
d. .00t files (Maptek Vulcan format)
e. .msr files (Minesight format)
f. .csv files (for block models)
You can trim surfaces and triangulate polylines, however, TIMining Delta cannot be used as a 3D editor
No, historical data cannot be stored. Such feature will be soon available in upcoming software releases
Check our other data analysis and simulation solutions that enable better Operational, Planning, Geotechnical and Continuous Improvement decisions
Integrated geotechnical monitoring & surveillance for pits, waste dumps, leaching pads and dams